THE ARCHITECTURE OF THE UNIVERSITY OF OREGON
Skybridge
Location: Franklin Boulevard.
Architects: Bora Architects; Ennead Architects.
Date: Construction began May 2019. Completion expected fall 2019. Opening date: Spring 2020.
Part of the Phil and Penny Knight Campus for Accelerating Scientific Impact
DESCRIPTION
The Skybridge crosses Franklin Boulevard to connect the science complex with the Knight Campus. It will rise 35 feet above the street level with the structure being approximately 50 feet high at its peak. The skybridge will be constructed with a structural steel frame that uses two butterfly arches and suspension cables. It will open in 2020 to coincide with the formal opening of the Knight Campus.
BIBLIOGRAPHY
"UO Skybridge Pairs Arching Form with Research Function," Register Guard, May 15, 2019. Web.
IMAGES
"Knight Campus Assets," https://accelerate.uoregon.edu/downloadable-knight-campus-assets
Page author: Edward H. Teague