THE ARCHITECTURE OF THE UNIVERSITY OF OREGON

Moshofsky Sports Center

2735 Leo Harris Parkway.  Part of Autzen Stadium Complex.

Architect: PIVOT Architecture (formerly WBGS Architect) with Ratio Architects; Chambers Construction.

DESCRIPTION

The Moshofsky Sports Center was dedicated in August 1998.  The 135,00 gsf facility includes an artificial surface football field and a 120-meter four-lane synthetic surface running track.  It can also accommodate use by the softball team and the university's golf teams.  A combination of indirect lighting and skylight panels facilitate an energy efficient and flexible lighting system.  The building hosts up to 5,000 football fans for tailgate parties during football game days.

BIBLIOGRAPHY

WBGS Architects, http://www.wbgs.com/Portfolio/Moshofsky.htm.

Oregon Ducks Football.  Wikipedia.  Accessed 29 Apr. 2015.

About the Moshofsky Center.  Web.  GoDucks.com.  Accessed 29 apr. 2015.


Page author:  Edward H. Teague